| * | 2009 |
| 9 | EE | Baoqiang Fan,
Rongjun Chen,
Guochun Tang:
Bicriteria Scheduling on Single-Machine with Inventory Operations.
COCOA 2009: 395-402 |
| 8 | EE | Rongjun Chen,
Baoqiang Fan,
Guochun Tang:
Scheduling Problems in Cross Docking.
COCOA 2009: 421-429 |
| 2008 |
| 7 | EE | Caixia Jing,
Guochun Tang,
Xingsan Qian:
Heuristic algorithms for two machine re-entrant flow shop.
Theor. Comput. Sci. 400(1-3): 137-143 (2008) |
| 6 | EE | Rongjun Chen,
Wanzhen Huang,
Guochun Tang:
Dense open-shop schedules with release times.
Theor. Comput. Sci. 407(1-3): 389-399 (2008) |
| 2007 |
| 5 | EE | Baoqiang Fan,
Jianzhong Gu,
Guochun Tang:
Scheduling a Flexible Batching Machine.
AAIM 2007: 91-99 |
| 2006 |
| 4 | EE | Baoqiang Fan,
Guochun Tang:
Scheduling Jobs on a Flexible Batching Machine: Model, Complexity and Algorithms.
TAMC 2006: 118-127 |
| 2001 |
| 3 | EE | Feng Zhang,
Guochun Tang,
Zhi-Long Chen:
A 3/2-approximation algorithm for parallel machine scheduling with controllable processing times.
Oper. Res. Lett. 29(1): 41-47 (2001) |
| 2000 |
| 2 | | Chung-Yee Lee,
Yong He,
Guochun Tang:
A note on "parallel machine scheduling with non-simultaneous machine available time".
Discrete Applied Mathematics 100(1-2): 133-135 (2000) |
| 1997 |
| 1 | EE | Zhi-Long Chen,
Qing Lu,
Guochun Tang:
Single machine scheduling with discretely controllable processing times.
Oper. Res. Lett. 21(2): 69-76 (1997) |