dblp.uni-trier.dewww.uni-trier.de

Chung-Yee Lee Vis

List of publications from the DBLP Bibliography Server - FAQ
Coauthor Index - Ask others: ACM DL/Guide - CiteSeerX - CSB - MetaPress - Google - Bing - Yahoo

*2009
27EEFeng Chen, Chung-Yee Lee: Minimizing the makespan in a two-machine cross-docking flow shop problem. European Journal of Operational Research 193(1): 59-72 (2009)
26EESean X. Zhou, Xiuli Chao, Chung-Yee Lee: Optimal transportation policies for production/inventory systems with an unreliable and a reliable carrier. J. Global Optimization 44(2): 251-271 (2009)
2008
25EEBo Chen, Chung-Yee Lee: Logistics scheduling with batching and transportation. European Journal of Operational Research 189(3): 871-876 (2008)
24EEJoseph Y.-T. Leung, Chung-Yee Lee, Chung W. Ng, Gilbert H. Young: Preemptive multiprocessor order scheduling to minimize total weighted flowtime. European Journal of Operational Research 190(1): 40-51 (2008)
23EEChung-Yee Lee, Gang Yu: Parallel-machine scheduling under potential disruption. Optimization Letters 2(1): 27-37 (2008)
22EEWikrom Jaruphongsa, Chung-Yee Lee: Dynamic lot-sizing problem with demand time windows and container-based transportation cost. Optimization Letters 2(1): 39-51 (2008)
2007
21EEChung-Yee Lee, Gang Yu: Single machine scheduling under potential disruption. Oper. Res. Lett. 35(4): 541-548 (2007)
20EEWikrom Jaruphongsa, Sila Çetinkaya, Chung-Yee Lee: Outbound shipment mode considerations for integrated inventory and delivery lot-sizing decisions. Oper. Res. Lett. 35(6): 813-822 (2007)
2006
19EESila Çetinkaya, Fatih Mutlu, Chung-Yee Lee: A comparison of outbound dispatch policies for integrated inventory and transportation decisions. European Journal of Operational Research 171(3): 1094-1112 (2006)
18EEChung-Yee Lee, Joseph Y.-T. Leung, Gang Yu: Two Machine Scheduling under Disruptions with Transportation Considerations. J. Scheduling 9(1): 35-48 (2006)
17EEIrina V. Gribkovskaia, Chung-Yee Lee, Vitaly A. Strusevich, Dominique de Werra: Three is easy, two is hard: open shop sum-batch scheduling problem refined. Oper. Res. Lett. 34(4): 459-464 (2006)
16EEKe Fu, Vernon Ning Hsu, Chung-Yee Lee: Inventory and Production Decisions for an Assemble-to-Order System with Uncertain Demand and Limited Assembly Capacity. Operations Research 54(6): 1137-1150 (2006)
2005
15EEChung-Lun Li, George Vairaktarakis, Chung-Yee Lee: Machine scheduling with deliveries to multiple customer locations. European Journal of Operational Research 164(1): 39-51 (2005)
2004
14EEYung-Chia Chang, Chung-Yee Lee: Machine scheduling with job delivery coordination. European Journal of Operational Research 158(2): 470-487 (2004)
13EEChung-Yee Lee: Inventory replenishment model: lot sizing versus just-in-time delivery. Oper. Res. Lett. 32(6): 581-590 (2004)
2003
12EEChung-Yee Lee, Sila Çetinkaya, Wikrom Jaruphongsa: A Dynamic Model for Inventory Lot Sizing and Outbound Shipment Scheduling at a Third-Party Warehouse. Operations Research 51(5): 735-747 (2003)
2001
11EEChung-Yee Lee, Lei Lei: Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases. Annals OR 102(1-4): 287-307 (2001)
2000
10 Chung-Yee Lee, Yong He, Guochun Tang: A note on "parallel machine scheduling with non-simultaneous machine available time". Discrete Applied Mathematics 100(1-2): 133-135 (2000)
1996
9EEChung-Yee Lee, Chung-Lun Li: On the Fixed Interval Due-date Scheduling Problem. Discrete Applied Mathematics 68(1-2): 101-117 (1996)
1995
8EEJeffrey W. Herrmann, Chung-Yee Lee: Solving a Class Scheduling Problem with a Genetic Algorithm. INFORMS Journal on Computing 7(4): 443-452 (1995)
1993
7EEChung-Yee Lee, Surya Danusaputro Liman: Capacitated Two-Parallel Machines Scheduling to Minimize Sum of Job Completion Times. Discrete Applied Mathematics 41(3): 211-222 (1993)
6EESurya Danusaputro Liman, Chung-Yee Lee: Error Bound of a Heuristic for the Common Due Date Scheduling Problem. INFORMS Journal on Computing 5(4): 420-425 (1993)
1992
5 Chung-Yee Lee, Surya Danusaputro Liman: Single Machine Flow-Time Scheduling with Scheduled Maintenance. Acta Inf. 29(4): 375-382 (1992)
1991
4EEChung-Yee Lee, Surya Danusaputro Liman, Chen-Sin Lin: Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date. Computers & OR 18(4): 379-389 (1991)
3EEChung-Yee Lee: Parallel machines scheduling with nonsimultaneous machine available time. Discrete Applied Mathematics 30(1): 53-61 (1991)
1989
2 Jing-Jang Hwang, Yuan-Chieh Chow, Frank D. Anger, Chung-Yee Lee: Scheduling Precedence Graphs in Systems with Interprocessor Communication Times. SIAM J. Comput. 18(2): 244-257 (1989)
1988
1EEChung-Yee Lee, J. David Massey: Multiprocessor scheduling: combining LPT and MULTIFIT. Discrete Applied Mathematics 20(3): 233-242 (1988)

Coauthor Index

1Frank D. Anger [2]
2Sila Çetinkaya [12] [19] [20]
3Yung-Chia Chang [14]
4Xiuli Chao [26]
5Bo Chen [25]
6Feng Chen [27]
7Yuan-Chieh Chow [2]
8Ke Fu [16]
9Irina V. Gribkovskaia [17]
10Yong He [10]
11Jeffrey W. Herrmann [8]
12Vernon Ning Hsu [16]
13Jing-Jang Hwang [2]
14Wikrom Jaruphongsa [12] [20] [22]
15Lei Lei [11]
16Joseph Y.-T. Leung [18] [24]
17Chung-Lun Li [9] [15]
18Surya Danusaputro Liman [4] [5] [6] [7]
19Chen-Sin Lin [4]
20J. David Massey [1]
21Fatih Mutlu [19]
22Chung W. Ng [24]
23Vitaly A. Strusevich [17]
24Guochun Tang [10]
25George Vairaktarakis [15]
26Dominique de Werra [17]
27Gilbert H. Young [24]
28Gang Yu [18] [21] [23]
29Sean X. Zhou [26]

Colors in the list of coauthors

Copyright © Tue Nov 3 08:52:44 2009 by Michael Ley (ley@uni-trier.de)