| * | 2009 |
| 47 | EE | Mohammad M. Fazel-Zarandi,
J. Christopher Beck:
Solving a Location-Allocation Problem with Logic-Based Benders' Decomposition.
CP 2009: 344-351 |
| 46 | EE | Daria Terekhov,
J. Christopher Beck:
An extended queueing control model for facilities with front room and back room operations and mixed-skilled workers.
European Journal of Operational Research 198(1): 223-231 (2009) |
| 45 | EE | Julien Bidot,
Thierry Vidal,
Philippe Laborie,
J. Christopher Beck:
A theoretic and practical framework for scheduling in a stochastic environment.
J. Scheduling 12(3): 315-344 (2009) |
| 2008 |
| 44 | | Jussi Rintanen,
Bernhard Nebel,
J. Christopher Beck,
Eric A. Hansen:
Proceedings of the Eighteenth International Conference on Automated Planning and Scheduling, ICAPS 2008, Sydney, Australia, September 14-18, 2008
AAAI 2008 |
| 43 | EE | Eric I. Hsu,
Christian J. Muise,
J. Christopher Beck,
Sheila A. McIlraith:
Probabilistically Estimating Backbones and Variable Bias: Experimental Overview.
CP 2008: 613-617 |
| 42 | EE | Ivan Heckman,
J. Christopher Beck:
Fitness-Distance Correlation and Solution-Guided Multi-point Constructive Search for CSPs.
CPAIOR 2008: 112-126 |
| 41 | EE | Jean-Paul Watson,
J. Christopher Beck:
A Hybrid Constraint Programming / Local Search Approach to the Job-Shop Scheduling Problem.
CPAIOR 2008: 263-277 |
| 40 | EE | J. Christopher Beck,
Tom Carchrae,
Eugene C. Freuder,
Georg Ringwelski:
A Space-Efficient Backtrack-Free Representation for Constraint Satisfaction Problems.
International Journal on Artificial Intelligence Tools 17(4): 703-730 (2008) |
| 39 | EE | Daria Terekhov,
J. Christopher Beck:
A Constraint Programming Approach for Solving a Queueing Control Problem.
J. Artif. Intell. Res. (JAIR) 32: 123-167 (2008) |
| 2007 |
| 38 | | Daria Terekhov,
J. Christopher Beck,
Kenneth N. Brown:
Solving a Stochastic Queueing Design and Control Problem with Constraint Programming.
AAAI 2007: 261-266 |
| 37 | EE | András Kovács,
J. Christopher Beck:
A Global Constraint for Total Weighted Completion Time.
CPAIOR 2007: 112-126 |
| 36 | EE | Daria Terekhov,
J. Christopher Beck:
Solving a Stochastic Queueing Control Problem with Constraint Programming.
CPAIOR 2007: 303-317 |
| 35 | EE | Julien Bidot,
Thierry Vidal,
Philippe Laborie,
J. Christopher Beck:
A General Framework for Scheduling in a Stochastic Environment.
IJCAI 2007: 56-61 |
| 34 | EE | J. Christopher Beck,
Michael Grüninger:
What's Your Problem? The Problem of Problem Definition.
SARA 2007: 393-394 |
| 33 | EE | J. Christopher Beck,
Nic Wilson:
Proactive Algorithms for Job Shop Scheduling with Probabilistic Durations.
J. Artif. Intell. Res. (JAIR) 28: 183-232 (2007) |
| 32 | EE | J. Christopher Beck:
Solution-Guided Multi-Point Constructive Search for Job Shop Scheduling.
J. Artif. Intell. Res. (JAIR) 29: 49-77 (2007) |
| 31 | EE | Alfio Vidotto,
Kenneth N. Brown,
J. Christopher Beck:
Managing restaurant tables using constraints.
Knowl.-Based Syst. 20(2): 160-169 (2007) |
| 2006 |
| 30 | | J. Christopher Beck,
Barbara M. Smith:
Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems, Third International Conference, CPAIOR 2006, Cork, Ireland, May 31 - June 2, 2006, Proceedings
Springer 2006 |
| 29 | | J. Christopher Beck:
An Empirical Study of Multi-Point Constructive Search for Constraint-Based Scheduling.
ICAPS 2006: 274-283 |
| 28 | EE | J. Christopher Beck,
Patrick Prosser,
Evgeny Selensky:
A case study of mutual routing-scheduling reformulation.
J. Scheduling 9(5): 469-491 (2006) |
| 2005 |
| 27 | EE | J. Christopher Beck:
Multi-point Constructive Search.
CP 2005: 737-741 |
| 26 | EE | Tom Carchrae,
J. Christopher Beck,
Eugene C. Freuder:
Methods to Learn Abstract Scheduling Models.
CP 2005: 842 |
| 25 | EE | Alfio Vidotto,
Kenneth N. Brown,
J. Christopher Beck:
Robust Constraint Solving Using Multiple Heuristics.
CP 2005: 871 |
| 24 | EE | Christine Wu,
Kenneth N. Brown,
J. Christopher Beck:
Scheduling with Uncertain Start Dates.
CP 2005: 872 |
| 23 | EE | J. Christopher Beck,
Nic Wilson:
Proactive Algorithms for Scheduling with Probabilistic Durations.
IJCAI 2005: 1201-1206 |
| 22 | EE | Tom Carchrae,
J. Christopher Beck:
Learning Abstract Scheduling Models.
SARA 2005: 354-355 |
| 2004 |
| 21 | | Tom Carchrae,
J. Christopher Beck:
Low-Knowledge Algorithm Control.
AAAI 2004: 49-54 |
| 20 | EE | J. Christopher Beck,
Patrick Prosser,
Richard J. Wallace:
Variable Ordering Heuristics Show Promise.
CP 2004: 711-715 |
| 19 | EE | J. Christopher Beck,
Tom Carchrae,
Eugene C. Freuder,
Georg Ringwelski:
Backtrack-Free Search for Real-Time Constraint Satisfaction.
CP 2004: 92-106 |
| 18 | EE | J. Christopher Beck,
Eugene C. Freuder:
Simple Rules for Low-Knowledge Algorithm Selection.
CPAIOR 2004: 50-64 |
| 17 | EE | J. Christopher Beck,
Patrick Prosser,
Richard J. Wallace:
Trying Again to Fail-First.
CSCLP 2004: 41-55 |
| 16 | | J. Christopher Beck,
Nic Wilson:
Job Shop Scheduling with Probabilistic Durations.
ECAI 2004: 652-656 |
| 15 | | J. Christopher Beck,
Patrick Prosser,
Richard J. Wallace:
Failing First: An Update.
ECAI 2004: 959-960 |
| 2003 |
| 14 | | J. Christopher Beck,
Patrick Prosser,
Evgeny Selensky:
Vehicle Routing and Job Shop Scheduling: What's the Difference?
ICAPS 2003: 267-276 |
| 13 | EE | J. Christopher Beck,
Philippe Refalo:
A Hybrid Approach to Scheduling with Earliness and Tardiness Costs.
Annals OR 118(1-4): 49-71 (2003) |
| 12 | EE | Jean-Paul Watson,
J. Christopher Beck,
Adele E. Howe,
L. Darrell Whitley:
Problem difficulty for tabu search in job-shop scheduling.
Artif. Intell. 143(2): 189-217 (2003) |
| 2002 |
| 11 | EE | J. Christopher Beck,
Patrick Prosser,
Evgeny Selensky:
Graph Transformations for the Vehicle Routing and Job Shop Scheduling Problems.
ICGT 2002: 60-74 |
| 10 | EE | J. Christopher Beck,
Patrick Prosser,
Evgeny Selensky:
On the Reformulation of Vehicle Routing Problems and Scheduling Problems.
SARA 2002: 282-289 |
| 2000 |
| 9 | | J. Christopher Beck:
Heuristics for Constraint-Directed Scheduling with Inventory.
AIPS 2000: 22-31 |
| 8 | EE | J. Christopher Beck,
Mark S. Fox:
Dynamic problem structure analysis as a basis for constraint-directed scheduling heuristics.
Artif. Intell. 117(1): 31-81 (2000) |
| 7 | EE | J. Christopher Beck,
Mark S. Fox:
Constraint-directed techniques for scheduling alternative activities.
Artif. Intell. 121(1-2): 211-250 (2000) |
| 6 | | J. Christopher Beck,
Andrew J. Davenport,
Claude Le Pape:
Introduction.
Constraints 5(4): 327-334 (2000) |
| 1999 |
| 5 | | J. Christopher Beck,
Mark S. Fox:
Scheduling Alternative Activities.
AAAI/IAAI 1999: 680-687 |
| 1998 |
| 4 | | J. Christopher Beck,
Mark S. Fox:
A Generic Framework for Constraint-Directed Search and Scheduling.
AI Magazine 19(4): 101-130 (1998) |
| 1997 |
| 3 | | J. Christopher Beck,
Andrew J. Davenport,
Edward M. Sitarski,
Mark S. Fox:
Beyond Contention: Extending Texture-Based Scheduling Heuristics.
AAAI/IAAI 1997: 233-240 |
| 2 | | J. Christopher Beck,
Andrew J. Davenport,
Edward M. Sitarski,
Mark S. Fox:
Texture-Based Heuristics for Scheduling Revisited.
AAAI/IAAI 1997: 241-248 |
| 1 | | J. Christopher Beck,
Andrew J. Davenport,
Mark S. Fox:
Five Pitfalls of Empirical Scheduling Research.
CP 1997: 390-404 |