| * | 2008 |
| 9 | EE | Alex J. Ruiz-Torres,
Grisselle Centeno:
Minimizing the number of late jobs for the permutation flowshop problem with secondary resources.
Computers & OR 35(4): 1227-1249 (2008) |
| 2007 |
| 8 | EE | Alex J. Ruiz-Torres,
Grisselle Centeno:
Scheduling with flexible resources in parallel workcenters to minimize maximum completion time.
Computers & OR 34(1): 48-69 (2007) |
| 7 | EE | Alex J. Ruiz-Torres,
Francisco J. López,
Johnny C. Ho:
Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs.
European Journal of Operational Research 179(2): 302-315 (2007) |
| 2006 |
| 6 | EE | Alex J. Ruiz-Torres,
Edgar Zapata,
Kazuo Nakatani,
Marcella L. Cowen:
Knowledge based representation and operations assessment of space transportation system architectures.
Knowl.-Based Syst. 19(7): 516-523 (2006) |
| 2005 |
| 5 | EE | Jatinder N. D. Gupta,
Alex J. Ruiz-Torres:
Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs.
European Journal of Operational Research 167(3): 679-695 (2005) |
| 2004 |
| 4 | EE | Dayana Cope,
Mansooreh Mollaghasemi,
Assem Kaylani,
Alex J. Ruiz-Torres,
Martin J. Steele,
Marcella L. Cowen:
An Integrated Estimation and Modeling Environment for the Design of the Orbital Space Plane.
Winter Simulation Conference 2004: 459-465 |
| 2000 |
| 3 | EE | Alex J. Ruiz-Torres,
Edgar Zapata:
Simulation based operational analysis of future space transportation systems.
Winter Simulation Conference 2000: 1123-1131 |
| 1998 |
| 2 | EE | Alex J. Ruiz-Torres,
Kazuo Nakatani:
Application of Real-Time Simulation to Assign Due Dates on Logistic-manufacturing Networks.
Winter Simulation Conference 1998: 1205-1210 |
| 1997 |
| 1 | EE | Alex J. Ruiz-Torres,
John E. Tyworth:
Simulation Based Approach to Study the Interaction of Scheduling and Routing on a Logistic Network.
Winter Simulation Conference 1997: 1189-1194 |